EN EN • 3CONGRATULATIONSon the purchase of your new CTEK professional battery man-agement unit. This unit is part of a range of professional bat-tery
12 • ENSMARTPASS LAMP FUNCTIONLAMP STEADY FLASHINGPower lamp Unit ready to use2Alternator battery consumption lampEngine running Too high current thr
EN EN • 13SMARTPASS LAMP ERROR INDICATION2 1 4 3EXPLANATION RECOMMENDATIONService battery overheated Check condition and/or installationToo high curre
14 • ENINSTALLATION OF UNIT1. Attach the temperature sensor holder on a flat surface on one Service battery. Position it as close as possible to a pos
EN EN • 15DRILL TEMPLATE90,6mm/3,57 inches120mm/4,72 inches210,6mm/8,29 inchesØ4,9 mm0,19 inches168mm/6⅝ inches
16 • ENSITUATIONSolar panel.PROBLEMA solar panel with 36 cells produces maximum power at about 17V. Many regulator reduce the voltage by “burning off”
EN EN • 17 WARNING!Max 23V input WARNING!D250S DUAL is not reverse polarity protectedSITUATIONOne alternator feeding a Starter battery and a small S
18 • ENSITUATIONOne alternator feeding a Starter battery and a large Service battery bank.PROBLEMThe Starter battery will not be fully charged and mig
EN EN • 19SITUATIONOne alternator and a Solar panel feed-ing a Starter battery and a small Service battery.PROBLEMThe Service battery will take a very
20 • ENLARGE SERVICE BATTERYINSTALLATION SHEET 5D250S DUAL12V+OUT+IN+IN +IN +OUT+OUTSMARTPASS12VSITUATIONOne alternator feeding a Starter battery and
EN EN • 21SITUATION230/110V charger for the Service and Starter battery.PROBLEMThe 230/110V charger should charge both the Service and the Starter b
4 • ENGENERATE EXPLOSIVE GASES DURING NORMAL BATTERY OPERATION. FOR THIS REASON, IT IS OF UTMOST IMPORTANCE THAT, YOU FOLLOW THE INSTRUCTIONS EACH TIM
22 • ENCONNECTING CONSUMERSSITUATIONConnection of consumers to the system.PROBLEMMany batteries die prematurely if they are discharged too much. Too l
EN EN • 23STEP 1 DESULFATIONDetects sulfated batteries. Pulsing current and voltage, removes sulfate from the lead plates of the battery restoring bat
24 • ENCABLE DIMENSIONSRecommended minimum cable dimensions in mm²MIN CABLE DIMENSIONSFUSE RECOM-MENDATIONSUNITCABLE0.5m/2 ft. 1m /3 ft. 2m /6 ft.
EN EN • 25TECHNICAL SPECIFICATIONSCharger modelD250S DUAL SMARTPASSModel numberD250S Dual, 1044 SMARTPASS, 1058Max input voltage 23V 23VCharging vol
26 • EN2012–05–3020020400ATEMPERATURE PROTECTIONSMARTPASS has a temperature sensor cable. The units will automatically protect the service battery if
EN EN • 5b) Be sure area around battery is well ventilated while bat-tery is being charged. c) Clean battery terminals. Be careful to keep corrosion
6 • EN15. FOLLOW THESE STEPS WHEN BATTERY IS OUTSIDE VEHICLE. A SPARK NEAR BATTERY MAY CAUSE BATTERY EXPLOSION. TO REDUCE RISK OF A SPARK NEAR BATTER
EN EN • 7wiring system; or an equipment-grounded conductor should be run with circuit conductors and connected to equipment-grounded terminal or lead
8 • ENDEFINITIONS SOLAR PANELDepending on the application, it could also be referred to as- PV panel- Photovoltaic panelCONNECTIONS- Solar panel- Wind
EN EN • 9D250S DUAL LAMP ERROR INDICATION EXPLANATION RECOMMENDATIONHigh temperature detected at either unit or ser-vice batteryConsider relocationg
10 • ENSMARTPASS SMARTPASS can operate as a stand-alone unit, but works best in combination with D250S Dual. The SMARTPASS creates a priority path for
EN EN • 11DEFINITIONS ALTERNATOR BATTERYDepending on the application, it could also be referred to as- Starter batteryCONNECTIONS- Trailer coupling- S
Comments to this Manuals